Single 1 – 2 tons units containing sand-cement mixture pre-filled bags, to be utilized for riser and pipe supports where grout bags cannot be placed.
The main bag comes with a bottom funnel to direct the drop of single bags, after cutting the retaining slings. Operability by diveror ROV.